[1]
Sarhan, O., Raslan, M. and Tallawi, G. 2021. Hollow-core precast and two-way solid slabs: Cost estimation and time duration comparison. International Journal of Advanced Engineering, Sciences and Applications. 2, 1 (Jan. 2021), 29–35. DOI:https://doi.org/10.47346/ijaesa.v2i1.22.